GL-OM-05 · Product File Management
Scope
Purpose: Product File Management produces one complete, signed product file per style, handed to Quality Assurance (QA) with a sealed approved sample. The file holds every standard the factory must work to: fit approvals, measurements, fabric and trim approvals, and the customer Purchase Order (PO). Missing documents leave QA with nothing to inspect against, so defects are found late.
Owner: PMR.
Applies to: Product Merchandiser (PMR), who owns the file, with Garment Technologist (GT), FT, QA, and Technical Manager (TM).
Requirements
-
R1 — Create the product file. PMR opens the file immediately after OC, before technical documents start collecting in email.
-
R2 — Add approvals and test documents as each step closes. GT files pattern and fit approvals, sewing instructions, measurement charts, tolerances, and the Red Seal fit sample record. FT files fabric approval forms, shade bands, lab test results, and trim approvals.
- File these items for every style: Product File Checklist, Sewing Instructions, Measurement Chart, Measurement Tolerances, approved fit sample (Red Seal), Gold Seal sample, customer PO, approved bulk fabric, approved shades (shade band), Trim Card, and Pilot Production Request.
- File these items when the style calls for them: approved print, approved embroidery, and the Fusing Data Sheet.
- Mark the checklist item as soon as the evidence is filed. Do not leave the entry for later.
-
R3 — Sign the completion checklist before the Pre-Production Meeting (PPM). PMR checks the file against the list in step 2 and signs it.
-
R4 — Hand over the file and the sealed sample to QA. PMR delivers both at the Monday Handover Meeting.
-
R5 — Confirm receipt before inspection starts. QA confirms it holds the complete file and the sealed sample.
Workflow
Used in
Forms to be used
Tutorial
This training video supports the Product File Management process. It does not replace the numbered steps.
Loading video…
Exam
| Pass mark | Expected duration | Attempts |
|---|---|---|
| 80% | About 10 minutes | 1 (one attempt per person) |
Pass mark 80%. 10 single-choice questions, one point each.
Your name and score are recorded and count towards the leaderboard. You have one attempt, so finish the article and the tutorial before you start.
Watch the tutorial video above to 100% to unlock the exam. The questions appear here once your progress is complete.
Changelog
Changelog
| Date | Changed by | What changed |
|---|---|---|
| 2026-10-12 | Technical | Training video added and exam published. |
| 2026-09-30 | Order Management | Converted from process to guideline (GL-OM-05). |
| 2026-09-21 | Technical Team | Translated the Turkish mirror's Tutorial section heading and intro text. |
| 2026-09-21 | Technical Team | Removed the duplicated Exam pass-mark table and Microsoft Form embed. |
| 2026-09-17 | Technical Team | Updated Product Inspection File Checklist to the direct SharePoint workbook link. |
| 2026-09-16 | Technical Team | Removed placeholder Forms to be used section until SharePoint links are published. |
| 2026-09-14 | Technical Team | Article Added |