GL-OM-04 · In-House Tests
Kapsam
Kapsam: Yıkama testleri, wearer trial ve drop/hang testleri dahil In-House Testing sürecini; üretim numunelerinin geçerli kalite, performans ve müşteri gereksinimlerine göre değerlendirilmesini uçtan uca kapsar.
Amaç: Üretim numunelerinin tanımlı koşullarda test edilmesini ve tespit edilen risk veya hataların üretim veya sevkiyattan önce değerlendirilmesini, çözülmesini ve onaylanmasını sağlar.
Sorumlu: DMR, test gereksinimleri, fonksiyonlar arası yürütme, sonuç değerlendirme ve gerekli onaylar dahil In-House Testing sürecinin sahibi ve koordinatörüdür.
Kapsadığı roller: Üretim test ve onay faaliyetlerinde yer alan FT, GT, PMR, QA ve ilgili Technical, MR ile tedarikçi/fabrika personeli için geçerlidir.
Gereklilikler
AAL
-
R1 — FT — Carry the in-house wash test out internally even if the customer does not request it
- The purpose of this procedure is to evaluate the general appearance and properties of garments after washing under consistent and repeatable conditions,.
- providing a standardized approach for internal quality control and being sure that the goods are in line with customer's quality standards.
-
R2 — FT — Detergent
- Use persil Color.
- Dosage: 20 g per wash.
- Do not use fabric softener or bleaching agents.
-
R3 — PMR — Washing Program
- Select the washing program according to the garment's care label / washing instructions.
- Care Label Instruction Recommended Machine Program Approx.. Duration Spin Speed.
- Double Bar / Very Gentle Delicate Program ~40 min 800 rpm.
- Single Bar / Gentle Mix Program ~1 hour 1, 000–1, 200 rpm.
- Normal Cotton Program ~1.5 hours 1, 000–1, 200 rpm.
-
R4 — PMR — Temperature
- Select the washing temperature according to the garment's care label instructions.
- Use in general, 30°C or 40°C.
- If the care label specifies a different temperature, follow the care label requirement.
-
R5 — FT — Cross-staining check
- When you wash a contrasting-coloured product to check for cross-staining, a small amount of dark-coloured fabric may give inaccurate results.
-
R6 — GT — Garment Preparation and Washing Process
- Wash at least 50 cm of fabric across the full width, or an amount of fabric equivalent to the fabric used in the product.
- Check that a suitable reference sample is available for comparison after washing. The measurements of the reference sample do not have to be identical to those of the test sample.
- Take and record the pre-wash measurements of the sample.
- Attach the multifiber to the sample.
- Load the washing machine with the garment and sufficient loading fabric to achieve a total load of approximately 2 kg.
- Add 20 g of Persil Color detergent.
- Select the appropriate washing program and temperature according to the garment's care label and start the washing cycle.
- After washing, dry the garment according to the care label instructions.
- Once the garment is completely dry, take the measurements again. Compare the pre-wash and post-wash measurements, calculate and record the shrinkage values as percentages (%). Evaluate the shrinkage result as pass/fail according to the applicable product group and customer manual/standards.
- Evaluate multifiber staining.
- Compare the washed garment with the original unwashed sample and check for any changes, including:
- Color change / color fastness.
- Pilling.
- Print appearance and durability.
- Loss or damage of stones, sequins, trims or other accessories.
- Color change of accessories.
- Changes in shape, appearance or surface.
- Any other deformation or deterioration caused by washing.
- Wash garments considered high-risk styles, particularly those with prints, stones, sequins, tassels, lace or similar accessories/details, at least 3 times. If the style is considered particularly high risk, the test should be repeated for up to 5 washing cycles.
-
R7 — PMR — Take samples for Garment Testing from Pilot Production
- The garments must include all trims, labels and prints.
-
R8 — PMR — If required, conduct print durability or other tests in accordance with the Customer's Manual
-
R9 — PMR — Share the Garment Test result with SpringNE and obtain approval if there is any fail
Wearer Trial
-
R10 — PMR / GT — Conduct a Wear Test under the following circumstances
-
When requested during the Risk Assessment Meeting.
-
When a risk is identified during the Fit Evaluation process.
-
When test results do not meet the required standards.
-
When a risk is identified during production inspections.
-
When specifically requested by the customer.
-
This procedure applies to all customers and all orders.
-
-
R11 — PMR — Method should be as below
- Step 1 – Initial Measurement: measure and record the sample garment before testing.
- Step 2 – First Wear & Wash Cycle.
- Wear the garment for at least 24 hours.
- Take post-wear measurements.
- The garment should then be washed according to the care instructions.
- Take post-wash measurements.
- Evaluate the overall appearance of the garment and user feedback from the 24-hour wear period.
- 2nd trial will be conducted with same method.
- Some customers have their own WT procedure; for example, some brands ask for 5 washes. In that case, follow the customer's WT procedure.
- Step 3 – Reporting & Approval.
- Document wear Test results in a Wear Test Report.
- Report link: In-House Wearer Trial Form.
- The report may be shared with the customer when required.
- For internal assessments, the Technical Manager (TM) provides the final approval.
Drop/Hang Test
-
R12 — GT — All products with a risk of stretching while hanging must undergo a Drop Test
- Examples of such products include.
- Heavy gauge knitwear.
- Viscose knitted garments.
- Loose-gauge knitted garments.
- Make the decision to conduct a Drop Test jointly with the customer, considering factors such as the garment gauge, yarn type, and knit structure.
- For example, links-links knit constructions typically have a higher tendency to stretch.
- Examples of such products include.
-
R13 — GT — Requirements
- Provide 3 garments made from production yarn or production fabric for testing.
- The test duration should be between 3 and 7 days, as agreed with the customer.
- Take key measurements and recorded before and after the test.
- Determine based on the Drop Test results, one of the following actions.
- Modification of the fabric, yarn, or knitting settings.
- Pattern adjustment or shortening of garment dimensions.
- No changes required to the garment.
- Due to recent issues experienced in production (e.g., a men's knitwear style that stretched excessively in stores by 5–10 cm after shipment), it has been decided that Drop Tests will also be conducted during production.
- QC should collect a Drop Test sample together with the wash test sample from the beginning of production.
- Conduct the Drop Test for 3–7 days.
- Complete the Drop Test before shipment approval is granted.
- Shipment approval should be based on the Drop Test results.
- The Merchandising Team is responsible for conducting and monitoring the Drop Test process.
Kullanıldığı yerler
Kullanılacak formlar
Eğitim
Bu eğitim videosu In-House Tests sürecini destekler; adımların yerine geçmez.
Loading video…
Sınav
In-House Tests süreci için sınav. Süreç makalesini — eğitim videosu dahil — tamamladıktan sonra bu sınavı çözün.
| Geçme notu | Beklenen süre | Deneme sayısı |
|---|---|---|
| 80% | Yaklaşık 10 dakika | 1 (kişi başına tek deneme) |
Geçme notu %80. 10 adet tek seçenekli soru, her biri 1 puan. Sınav İngilizcedir.
Adınız ve puanınız kaydedilir ve liderlik tablosuna eklenir. Yalnızca bir deneme hakkınız vardır; başlamadan önce makaleyi ve eğitim videosunu bitirin.
Sınava başlamak için yukarıdaki eğitim videosunu %100 izleyin. İlerleme tamamlandığında sorular burada görünür.
Değişiklik günlüğü
Değişiklik günlüğü
| Tarih | Değiştiren | Değişiklik |
|---|---|---|
| 2026-10-12 | Order Management | R5 (çapraz boyama kontrolü) ve R11'deki müşterilerin kendi WT prosedürleri notu daha anlaşılır yazıldı. |
| 2026-10-12 | Order Management | Eğitim videosu eklendi ve sınav yayımlandı. |
| 2026-09-30 | Order Management | Süreçten yönergeye dönüştürüldü (GL-OM-04). |
| 2026-09-15 | Order Management | Süreç adımları AAL, Wearer Trial ve Drop/Hang Test başlıkları altında gruplandı. |
| 2026-09-15 | Order Management | In-House Tests Form SharePoint bağlantısı Referanslar bölümüne eklendi. |
| 2026-09-15 | Order Management | 6. adımdaki yıkama kontrol alt maddeleri iç içe numaralandırılmamış liste olarak düzeltildi. |
| 2026-09-15 | Order Management | İlgili süreç referansları eklendi. |
| 2026-09-11 | Order Management | Article Added |