SOP-OM-03 · Order Confirmation & Sign-Off
Kapsam
Kapsam: OC/PO doğrulamasından tedarikçi onayı, numune onayı, BOM tamamlama, CRM/SAP entegrasyonu ve maliyet/marj onayına kadar uçtan uca sipariş onayı ve sign-off sürecini kapsar.
Amaç: Müşteri siparişlerinin üretim ve sonraki süreçlere geçmeden önce doğru şekilde incelenmesini, onaylanmasını ve kaydedilmesini sağlar.
Sorumlu: DMR, gerekli fonksiyonlar arası faaliyetler ve onaylar dahil Order Confirmation & Sign-Off sürecinin sahibi ve koordinatörüdür.
Kapsadığı roller: CRM ve SAP üzerinde Order Management ve Pre-Production faaliyetlerinde yer alan DMR, MR, Quality, Finance, CEO/CFO ve ilgili tedarikçi/fabrikalar için geçerlidir.
Süreç
-
DMR — Receive OC form from customer which may have different names depending on the client
- The OC date must be recorded as the date on which both parties confirmed the order with the correct details, not the date the customer sent the form.
- Orders must not be confirmed without a buyer-approved sample.
- Orders must not be confirmed if physical copy of buyer approved buying sample is unavailable.
- Orders must not be confirmed based solely on CADs.
-
DMR — Check Correct Date, Price, Lead time and all other details
-
DMR — Upload OC form into CRM PDF/Excel etc
- The OC date is the date both parties agreed on not the OC form received date.
- If all information is correct and agreed upon, the order can proceed with OC forms before receiving actual Pos.
- All confirmed orders must be entered in CRM within 2 working days (an order confirmed by buyer, factory and SpringNE counts as a confirmed order; there is no need to wait for the official order).
- All official orders must be entered in SAP within 5 working days of receipt.
-
DMR — Set Order Status as 'Projection'
-
DMR — Check Correct Date, Price, Lead time and all other details and send OC Form to vendor
-
DMR — Share the Vendor, Customer, Quantity, Designer, Colour information via Teams in Product Review Channel
-
DMR — Agree with customer on master fabric reference at PO receive step and give all further base, bulk fabric approvals with this master sample
-
DMR — Follow up official PO to be received in 5 working days either by email in PDF, Excel etc. or download from customer systems
-
DMR — Check Date, Price, Quantity, Packing Details, Factory information on PO against OC (Bkz. GL-OM-01 CP Management — R2)
-
If all information is correct continue to CRM Entry.
-
If all information is not correct ask customer to amend.
-
This process repeats until correct PO receive.
-
Base fabric data sheet and test results should be reviewed and checked in advance to confirm the PO with vendor.
-
POs requiring correction (price, delivery date, etc.) must be formally amended within 2 working days.
-
-
DMR — Download, convert to word, edit and convert edited word to PDF for Vendor view
-
DMR — Upload Customer PO to Order > Documents in CRM (Bkz. GL-OM-05 Product File Management — R1)
- Some customers send POs directly to vendor.
-
DMR — Set order status to 'Open'
-
DMR — The system then automatically sends the SAP PO to vendors
-
DMR — Check that the order information has been transferred correctly to SAP within the scope of the CRM-SAP integration
-
DMR — Go to BOM Page in CRM and fill the fabric or yarn details, Print and/or component information, from fabric/yarn spec as sub-component
- If this step is skipped, purchase orders remain as Projection in the CRM, which will delay both finance and quality control processing.
-
DMR — If the gross margin is equal to or above 5%, the costing can be approved automatically in SAP CS; no Director approval is required
-
DMR — If the gross margin is below 5%, the costing is sent by e-mail to the CEO for approval
-
DMR — If the gross margin is negative, the costing can only be approved by the Group CEO or CFO
İş akışı
Eğitim
Bu eğitim videosu Order Confirmation & Sign-Off sürecini destekler; adımların yerine geçmez.
Loading video…
Sınav
Order Confirmation & Sign-Off süreci için sınav. Süreç makalesini — eğitim videosu dahil — tamamladıktan sonra bu sınavı çözün.
| Geçme notu | Beklenen süre | Deneme sayısı |
|---|---|---|
| 80% | Yaklaşık 10 dakika | 1 (kişi başına tek deneme) |
Geçme notu %80. 10 adet tek seçenekli soru, her biri 1 puan. Sınav İngilizcedir.
Adınız ve puanınız kaydedilir ve liderlik tablosuna eklenir. Yalnızca bir deneme hakkınız vardır; başlamadan önce makaleyi ve eğitim videosunu bitirin.
Sınava başlamak için yukarıdaki eğitim videosunu %100 izleyin. İlerleme tamamlandığında sorular burada görünür.
Değişiklik günlüğü
Değişiklik günlüğü
| Tarih | Değiştiren | Değişiklik |
|---|---|---|
| 2026-10-01 | Order Management | Sınav Microsoft Forms'tan bu sayfaya taşındı; puanlar artık liderlik tablosuna ekleniyor. |
| 2026-09-30 | Order Management | Yönerge referansları eklendi. |
| 2026-09-21 | Order Management | Order Confirmation & Sign-Off sınavı yayımlandı ve eğitim videosuna bağlandı. |
| 2026-09-15 | Order Management | İlgili süreç referansları eklendi. |
| 2026-09-11 | Order Management | Article Added |