Ana içeriğe geç
Order Management · Yönerge

GL-OM-05 · Product File Management

Kapsam​

Amaç: Product File Management produces one complete, signed product file per style, handed to Quality Assurance (QA) with a sealed approved sample. The file holds every standard the factory must work to: fit approvals, measurements, fabric and trim approvals, and the customer Purchase Order (PO). Missing documents leave QA with nothing to inspect against, so defects are found late.

Owner: PMR.

Applies to: Product Merchandiser (PMR), who owns the file, with Garment Technologist (GT), FT, QA, and Technical Manager (TM).

Gereklilikler​

  1. R1 — Create the product file. PMR opens the file immediately after OC, before technical documents start collecting in email.

    • Add the customer PO and the customer order documents first.
    • Keep the file in the CRM / SharePoint product file store, so every role works on one copy.
  2. R2 — Add approvals and test documents as each step closes. GT files pattern and fit approvals, sewing instructions, measurement charts, tolerances, and the Red Seal fit sample record. FT files fabric approval forms, shade bands, lab test results, and trim approvals.

    • File these items for every style: Product File Checklist, Sewing Instructions, Measurement Chart, Measurement Tolerances, approved fit sample (Red Seal), Gold Seal sample, customer PO, approved bulk fabric, approved shades (shade band), Trim Card, and Pilot Production Request.
    • File these items when the style calls for them: approved print, approved embroidery, and the Fusing Data Sheet.
    • Mark the checklist item as soon as the evidence is filed. Do not leave the entry for later.
  3. R3 — Sign the completion checklist before the Pre-Production Meeting (PPM). PMR checks the file against the list in step 2 and signs it.

    • If every mandatory item is filed, PMR signs the checklist and books the handover.
    • If anything is missing, do not hold the PPM. PMR records the open items on the checklist, names the owner of each one, and escalates to TM.
  4. R4 — Hand over the file and the sealed sample to QA. PMR delivers both at the Monday Handover Meeting.

    • If there is no meeting that week, send the file and the sample to the production site, marked for the attention of QA.
    • Deliver only a sealed and signed approved sample. An unsealed sample is not a standard, so QA cannot inspect against it.
  5. R5 — Confirm receipt before inspection starts. QA confirms it holds the complete file and the sealed sample.

    • If documents are missing, QA does not start the inspection. QA returns the gaps to PMR and escalates to TM.
    • Keep the checklist as the record of what was outstanding and when it was closed.

İş akışı​

Create the product file
Add approvals and test documents as each step closes
Sign the completion checklist before the PPM
Hand over the file and the sealed sample to QA
Confirm receipt before inspection starts

Kullanıldığı yerler​

Kullanılacak formlar​

Eğitim​

Bu eğitim videosu Product File Management sürecini destekler; adımların yerine geçmez.

Loading training video…

Loading video…

Sınav​

Geçme notuBeklenen süreDeneme sayısı
80%Yaklaşık 10 dakika1 (kişi başına tek deneme)

Geçme notu %80. 10 adet tek seçenekli soru, her biri 1 puan. Sınav İngilizcedir.

Adınız ve puanınız kaydedilir ve liderlik tablosuna eklenir. Yalnızca bir deneme hakkınız vardır; başlamadan önce makaleyi ve eğitim videosunu bitirin.

Kilitli

Sınava başlamak için yukarıdaki eğitim videosunu %100 izleyin. İlerleme tamamlandığında sorular burada görünür.

Changelog​

Değişiklik günlüğü
TarihDeğiştirenDeğişiklik
2026-10-12TechnicalEğitim videosu eklendi ve sınav yayımlandı.
2026-09-30Order ManagementSüreçten yönergeye dönüştürüldü (GL-OM-05).
2026-09-21Technical TeamTürkçe sürümdeki Eğitim bölümünün başlığı ve giriş metni Türkçeleştirildi.
2026-09-21Technical TeamSınav bölümündeki yinelenen geçme notu tablosu ve Microsoft Form gömülü bileşeni kaldırıldı.
2026-09-17Technical TeamProduct Inspection File Checklist doğrudan SharePoint çalışma kitabı bağlantısıyla güncellendi.
2026-09-16Technical TeamSharePoint bağlantıları yayımlanana kadar yer tutucu Kullanılacak formlar bölümü kaldırıldı.
2026-09-14Technical TeamArticle Added