Ana içeriğe geç

Production Wash ALL Test

Kapsam​

Amaç: The Production Wash ALL Test monitors wash performance while bulk production runs. The factory washes representative garments each production day so wash-related faults surface before shipment. This is separate from SpringNE In-House Tests, which run in the office laboratory.

Owner: QA / GT.

Applies to: Factory quality teams, SpringNE QA, and vendors running bulk production.

Process​

  1. Wash daily during bulk production. For each running style, wash a minimum of 2 garments per production day.

    • Second-quality garments may be used if every existing fault is identified and marked before washing.
    • Mark faults so pre-wash issues are clearly distinct from wash-related results.
  2. Follow the care label program. Wash garments according to the care label.

    • Regular garments: 3 washes.
    • Embellishment garments: 5 washes.
  3. Evaluate after each wash. The factory reviews appearance after every wash cycle and reports problems to the SpringNE QA team.

  4. Keep washed samples available. Retain washed samples on site for inspection.

İş akışı​

Wash daily during bulk production
Follow the care label program
Evaluate after each wash
Keep washed samples available

Eğitim​

Bu eğitim videosu Production Wash ALL Test sürecini destekler; adımların yerine geçmez.

Pending
Eğitim videosu henüz eklenmedi

Yönetici, Production Wash ALL Test eğitimi hazır olduğunda Microsoft Stream veya SharePoint bağlantısını ekleyecek.

Sınav​

Geçme notuBeklenen süreDeneme sayısı
80%Yönetici yakında ekleyecekYönetici yakında ekleyecek
Bekliyor

Sınav henüz yayımlanmadı. Değerlendirme hazır olduğunda yönetici buraya ekleyecek.

Changelog​

Değişiklik günlüğü
TarihDeğiştirenDeğişiklik
2026-09-21Technical TeamTürkçe sürümdeki Eğitim bölümünün başlığı ve giriş metni Türkçeleştirildi.
2026-09-14Technical TeamArticle Added